Early Projects.

Now that I’ve discovered my tank apparently does not leak to any bothersome degree, I can get more into projects. Actually I’ve begun a few projects as I was incrementally filling and checking for leaks of the water tank. I’ve finished restoration, cleaning and applying teak oil to the two teak cockpit floor panels. I also cleaned the cockpit floor under them and tested the 4 cockpit floor drains. Both to see which thru-hulls they drain to and to check for any leaking into the boat possibly contributing to the suspicion of the tank leaking. All seems good, no interior leaks were found. Eventually I’ll clean, restore and oil the teak cockpit seats. This must be done in place and only one side at a time so the companionway is accessible. Perhaps I’ll do the cockpit seats in conjunction with revarnishing the floor of the aft cabin and head. I’ll set up my tent and sleep there a few nights. I also screwed in place the ves...